14-Week Cycle Extension: Mapped from IT thermal variance logs. 99.4% uptime target. Budget: 2.4k allocation per cycle.
| Step | Procedure | Metric | Status |
|---|---|---|---|
| 1 | Inspect loop pumps (torque 12Nm) | Pressure: 4.2 bar | Pass |
| 2 | Check radiator fins (cleaning schedule) | Delta-T: <15°C | Pass |
| 3 | Fluid analysis (pH 7.2-7.8) | Contaminants: 0ppm | Pass |
Next check: Week 2 of current 14-week ledger. All components verified pre-deployment.