Solar Array Diagnostics Checklist
14-week cycle drawn from IT power variance logs. Measured steps for habitat array verification.
Protocol Steps
- Record baseline output at 0600: target 2.4 kW per panel bank.
- Inspect junction temperatures — log deviations above 0.5°C.
- Run impedance test on feeds: 0.02 ohm max variance.
- Verify dust accumulation index against last cycle.
- Update 14-week maintenance ledger with timestamped results.