Solar Array Diagnostics Checklist

14-week cycle drawn from IT power variance logs. Measured steps for habitat array verification.

Protocol Steps

  1. Record baseline output at 0600: target 2.4 kW per panel bank.
  2. Inspect junction temperatures — log deviations above 0.5°C.
  3. Run impedance test on feeds: 0.02 ohm max variance.
  4. Verify dust accumulation index against last cycle.
  5. Update 14-week maintenance ledger with timestamped results.